1.1 understand the project: project category, area, location, investment budget plan, design and construction period, etc. Detailed communication before entering the next stage of work.
1.2 understand the design team: company profile, organizational structure, team, design process, past performance, etc.
2.1 design fee and quotation: both parties shall communicate with each other to enhance understanding and determine cooperation.
2.2 Contract formulation: contract signing.
3.1 site investigation: fully understand the site situation. After the top-level design concept is determined, the next stage is expanded preliminary design.
3.2 market research: fully understand project types and market conditions.
3.3 data analysis: after detailed analysis, the design direction is discussed.
3.4 design positioning: accurately obtain the design positioning and design objectives.
4.1 functional analysis: fully determine the project functional requirements. After determining the layout of the functional planning (including the regulations of relevant departments such as fire control and sanitation), we will enter the next stage.
4.2 function analysis: plane function plan. After detailed analysis, a reasonable and detailed plane function layout is obtained.
5.1 three-dimensional space design: make full use of the three-dimensional model to present the design plan, and accurately express the design concept through three-dimensional space relations. After the result of 3D design phase is confirmed, the work phase of deepening drawing is entered.
5.2 main material sample: design and select materials through physical sample.
6.1 title page and contents:
6.2 plane ceiling series
6.3 elevation series
6.4 sample series of nodes
7.1 water supply and drainage system diagram
7.2 strong and weak points system diagram
7.3 HVAC system diagram
8.1 design scheme: further deepen the design of soft assembly jewelry collocation, improve the effect of space and overall design. Only after the design scheme is confirmed, can we enter the work of accessories quotation and procurement, etc.
8.2 project implementation: procurement and customization of accessories shall be carried out according to the design results of soft decoration scheme. Furnishings shall be according to soft decoration material: lamp and furniture- cloth art – picture article – adorn article. Accessories implementation can conduct customized procurement after party A signed accessories sample confirmation,. Strictly place items according to the design drawings . If anything improper, notify the designer for coordination.
9.1 implementation disclosure and multi-party review: the disclosure, joint review and question answering before the implementation of the project shall be carried out at the meeting to clarify the design intention and construction details. Party a, the designer, the construction party, the supervisor and other relevant personnel must be present. The disclosure of the project is too important to be ignored. The project construction budget, construction bidding and construction implementation can only be carried out after the design drawings are handed over.
9.2 on-site cooperation: during the project implementation, all parties of the project shall actively cooperate to solve on-site problems. Bring the latest drawings to the site for guidance
10.1 completion acceptance: garbage cleaning, transportation and cleaning. Bring the latest drawings to the site for acceptance
10.2 completion drawing: after the completion of the project, the drawings shall be updated and backed up. Strictly follow the actual situation of the project site to update the drawings for reference.